Thursday, September 12, 2013

Stairs. Grade work. Second floor.

Today Dustin came and fixed the grade and filed in garage.  Also did the drain pipe for foundation.  Oh yeah...  Dropped about $3k+ on gravel.... Zzzzzz.   

Hipolito did the stairs..  Awesome!!   He framed in the second floor too.

We had to do a lot of work this morning moving stuff around on the lot.   Mark brought over the drainage pipe today too.

Lots done.  Should be able to pour the garage tomorrow and front porch.

No comments:

Post a Comment