Wednesday, October 9, 2013

Vendor Update and Stuff

So ... here is the update.    

Got my first huge bill from 84 Lumber today.  (thanks Mark).  
HVAC - the guys from Rocky Top Heating and Air have been working all week and should be done with the HVAC rough in probably today.
PLUMBING - He should be done this week - but kinda been AWOL.  We have the rough in plumbing stuff ready.   Not too worried.   
GARAGE DOORS - So, wife found a garage door guy that beat Dukes out that does Amarr doors.  So, we got belt drives, keypad, and controllers - 2 in steel back insulated "fake wood" doors with glass and hinges.  Saved about $500 overall - maybe.   I don't remember the guys name.
Electrician - He is starting Monday - and wants to be the only contractor in the house.  He's a machine and has a huge crew - committed to be done in 2 days
Insulation - about 90% sure that we'll be using my vendor CFI (Mike W.) for insulation.  He comes recommended by Cooks and Fuad.  
Sheetrock - we are on the schedule for Mr. Lynch and his people.  They met budget and are in the works.
Brick - ACME Block and Brick are scheduled to drop off brick Monday AM.   Told Hipolito to get guys started Monday
Framing - Hipolito is getting all windows set today (Wed.) and will be working on the garage bump out tomorrow.  He is pushing to get done this week.   The shingles are about 95% done.

Here is the picture from the high side looking down the side of the house

It's always really cool to see about 20 trucks lined up
 ... but, yeah, neighbors are getting angry