Grade work! Getting ready for utilities...

We have Dustin from DRW Excavating (he's awesome) digging the grade work.   Below he has the water line, the sewer line, and electrical ditch (behind) dug and ready for inspection.    We got a lot of stuff done today.   KUB came by and actually put the gas line in ... but, we are still awaiting an inspection before we can get it turned on.

Randy and Jeffrey are working on the brick stairs ... should be done with them completely in 1 day.  He's the man.


Our plumber, Jason Strickland, is great too.  We called him and he came over to help because we needed the sewer line installed.  We have to get everything inspected so that we can allow Dustin to cover everything up before we lose him again to another job.  We are sweating it ...


The water line loops back in front of the house ...
We are really optimistic that we can get the gas/electric turned on by Friday.  If that happens, we can heat the house and start wood floors etc. on Monday.   It's stressful because we are fighting for everything we can get.

My friend Erin came by the house today - he really liked it.   It was really good seeing him again.